Our client, Maderas Besteiro, was in charge of drafting this emblematic project (structural analysis and design), involving the manufacture of all pieces, a numerical control, subsequent treatment, and finally, assembly management.
The new sports hall of the Alice Salomon School in Hanover is exceptional from an architectural and structural point of view. The timber structure stands on a reinforced concrete first floor and cantilevers above it at the sides about 18 ft.
At over 807,293.28 square feet, the new Tianfu Agriculture Exposition is the largest timber structure in Asia, and one of the largest timber structures in the world. It is a series of five arched halls that use unique Vierendeel-inspired trusses.
The construction of a 328-foot-high tower at an altitude of about 6,890 ft above sea level is a particularly challenging task. A project of this type was realized in September 2020 in the area of the "Windsfeld" summit in Flachau / Flachauwinkl, Austria. The met mast is one of the tallest structures in Austria.
The village center in Kappl, Tyrol, Austria includes three separate structures forming a U shape. The total area of all three components is 911,118 ft³ and includes a café, retail shops, and visitors' center, as well as a large multipurpose hall.
In Passau's Haidenhof district, a new sports hall extends to the existing school building. A 196.8-foot-long indoor athletics competition facility with four tracks - the "sprint tunnel" - connects the hall and the existing building.
The Belin-Béliet (department of Gironde) municipality tennis club, founded in 1976, completed a new tennis hall in July 2019. This project was made possible due to a subsidy provided by the French Tennis Federation along with the support of the municipality.
Adohi Hall, which means “woods” in Cherokee, located at the University of Arkansas (U of A), is the first university housing and mixed-use structure of its kind.
The ALBYR Structures team was commissioned to design a new industrial hall in a high seismic activity region. The hall includes seven interior double-hinged frames with tapered beam ends as well as floor levels for offices. The columns were designed to support crane girders for a 5.5-ton crane.
To meet the needs of its citizens, the city of Donzère decided to build a sports hall on a large triangular island, at the foot of the historic village. The new structure, dedicated to local schools and clubs, created the opportunity for sports event practice and competitions.
The architectural highlight of the Halle (Saale) bus station includes stylish canopies over the bus platforms. The continuous lights integrated at the roof edges are a real eye-catcher, especially at night.
CIMU - ILE DE SEGUIN is part of the "La Seine Musicale" cultural center on Seguin Island (Ile Seguin) in Boulogne-Billancourt, a suburb of Paris. The CIMU houses a concert hall that can seat up to 1,150 people. The round facade includes exterior glass cladding.
Within a short period of time, a modern aluminum structure with sophisticated building services was constructed for the company Hydro Aluminium in Grevenbroich.
The construction project on the premises near Düsseldorf covers approximately a length of 722 ft and a width of 394 ft. It includes various connecting bridges to the existing premises, a three-aisle production hall with outbuildings, and a 328-foot-long and 99-foot-high high-rack warehouse, which was constructed in slipform paving technology.
A chipboard factory in Germany was renovated at the beginning of 2014. The main structural elements were made of S235 steel hot‑rolled shapes and the structure was set on a slab foundation.
Théâtre Marigny is located on the Avenue des Champs-Elysées in Paris. The building (hall, ceiling, decor) as well as the wooded area, situated next to the Elysée Palace, have been declared historical monuments.
A new multi‑purpose hall in the historic city center of Calais, France was inaugurated in mid-June 2015.
The hall, made of steel, timber, and aluminum, has a modular structure. Therefore, it can be used for many occasions (weekly markets, fairs, concerts, spectacles, and much more).
The clear style and the windows on the north and south sides allow a great deal of daylight, which is reflected by the internal wood cladding. On the west side, a folding door can be opened. It can then be used as a 69-foot-wide outdoor stage.
A student team from the Czech Technical University (CTU) in Prague took third place overall in the Solar Decathlon 2013, an engineering competition which is organized biennially by the U.S. Department of Energy. The competition challenged 20 collegiate teams from around the world to design, build, and operate an energy-efficient solar-powered house.
An extraordinary project was born when the architectural office of bergmeister-wolf designed a new workshop for wood carving art in Val Gardena, South Tyrol.
As the triangulated facade could be used only partially for load application, the building represented a great challenge for the responsible timber construction engineer. But the Italian Dlubal Software customer Schrentewein & Partner mastered the task by primarily using the building's inside parts for transferring loads.
The project for designing a filter/dryer device, including agitator, required a complete stress and deformation analysis in RFEM. The complex modeling of the structure, which had 1,424 surfaces, 158 solids, and 425 members, represented a special design challenge.
For the construction of a new elementary and high school building in Laupheim, Germany, the city of Laupheim organized an architectural competition, which was won by the Herrmann + Bosch Architekten studio from Stuttgart.