Reinforced Concrete Bridge on Pile Foundation
Customer Project
The model includes 115 load cases and 20 result combinations.
Structural Engineering |
Buschina + Spreitzer ZT GmbH Hochheimgasse 6 A-1130 Vienna Tel.: +43 (01) 803 30 52-0 |
Write Comment...
Write Comment...
Contact Us
Do you have further questions or need advice? Contact us via phone, email, chat, or forum, or search the FAQ page, available 24/7.

Consideration of Construction Stages in RFEM 6
The calculation of complex structures by means of finite element analysis software is generally performed on the entire model. However, the construction of such structures is a process carried out in multiple stages where the final state of the building is achieved by combining the separate structural parts. To avoid errors in the calculation of overall models, the influence of the construction process must be considered. In RFEM 6, this is possible using the Construction Stages Analysis (CSA) add-on.