Crane Bridge in Mannheim Harbor, Germany

The crane bridge, dating from 1924, was to be equipped with a new upper crane.

Since no drawings or structural documents existed, the bridge had to be redesigned completely.

Structure

The original steel structure of the crane bridge in Mannheim Harbor, Germany was built in 1924. Recently, it was to be equipped with a new upper crane.

The lifting capacity of the crane bridge is 6.6 t.

Structural Planning

Since no drawings or structural documents remained, the bridge had to be redesigned completely.

The engineering office of Burgdorf, a customer of Dlubal Software, was responsible for the control calculations as well as the structure of the necessary reinforcement.