Structure
The original steel structure of the crane bridge in Mannheim Harbor, Germany was built in 1924. Recently, it was to be equipped with a new upper crane.
The lifting capacity of the crane bridge is 6.6 t.
Structural Planning
Since no drawings or structural documents remained, the bridge had to be redesigned completely.
The engineering office of Burgdorf, a customer of Dlubal Software, was responsible for the control calculations as well as the structure of the necessary reinforcement.