"Crocodile" Building in the Lokstadt Area Development in Winterthur, Switzerland
Customer Project
Lokstadt, a new urban district, is under construction in the city of Winterthur, Switzerland. The first building to be completed is called "Crocodile". This residential building, which was BIM planned right from the start, is one of the largest timber structures in Switzerland.
Investors |
Implenia AG Switzerland Anlagestiftung Adimora Gaiwo Genossenschaft für Alters- und Invalidenwohnungen Gesewo Genossenschaft für selbstverwaltetes Wohnen |
General contractor |
Implenia Schweiz AG www.implenia.com |
Architecture |
ARGE Baumberger & Stegmeier AG KilgaPopp Architekten AG |
Structural engineering (timber) and fire protection |
Timbatec Holzbauingenieure Schweiz AG www.timbatec.com |
Structural engineering (concrete) |
Dr. J. Grob & Partner AG www.gropar.ch |
Structural Data
Model
Dlubal customer Timbatec Timber Construction Engineers Switzerland Ltd. was responsible for the structural analysis of the timber structure and decided to use RSTAB.
The name "Lokstadt" was chosen because locomotives and other machines were once built on the site. From 1850 to 2010 Lokstadt was the most important production site for new locomotives and trains in Switzerland. The "Crocodile" (the first electric locomotive installed on the Gotthard railway) has been built here since 1919. The name of the first building to be completed pays homage to this legendary locomotive.
Structure
The "Crocodile" building is a six- to eight-story timber structure. It has a ring-like shape surrounding a courtyard and external dimensions of 348 ft in length, 213 ft in width, and 82 ft in height. The new building with, about 322,917 ft² of net internal area, houses 248 cooperative, rented, and owner-occupied apartments, as well as commercial space on the main floor.
The structure is a mixture of reinforced concrete and timber framing. The basement, part of the main floor, and the stairwells were made of reinforced concrete. The structural system of the rest of the building consists of glued-laminated timber columns and beams as well as large cross-laminated timber panels serving as floor slabs or hollow box elements for the roof. The CLT slabs have a length of up to 62 ft and a weight of up to 5.512 tons. The outer walls consist of prefabricated timber frame elements including factory-installed windows.
This timber structure is a major contributor in preventing climate change. The timber used in the "Crocodile" building removes 7,070 tons of CO2 from the environment and stores it on a long-term basis.
Source: Konstruktiver Ingenieurbau 04/2022, pp. 23-30
Project Location
Zürcherstrasse 41Keywords
Residential building Timber Glued-laminated timber Cross-laminated timber Concrete
Write Comment...
Write Comment...
Contact Us
Do you have further questions or need advice? Contact us via phone, email, chat, or forum, or search the FAQ page, available 24/7.

Separate Load Entry for Structure or Foundation Design
In RF-/FOUNDATION Pro, the foundation design requires the definition of the corresponding loading (load cases, load combinations, or result combinations) for different design situations (STR, GEO, UPL, or EQU).
- I have defined temperature loads, strain loads, or a precamber. Once I modify stiffnesses, the deformations are no longer plausible.
- Is it possible to transfer properties, such as the cross-section, or the surface thickness as well as the material of a surface, of an existing element to a new element?
- How can I enter or read out a response spectrum via the COM interface in DYNAM Pro?