FAQ 002273 EN-US

Add-on Modules FOUNDATION Pro RF-FOUNDATION Pro

Why is the option ”Earth covering (permanent)“ grayed out in Table 1.4 of the FOUNDATION Pro add-on module?

Answer

If you have selected neither the direct calculation of the bearing capacity according to EN 1997-1 Annex D nor the analysis of safety against sliding, you don't have to enter a soil profile. You can enter the earth covering as load afterwards.

Keywords

earth covering grayed out

Contact us

Contact Dlubal Software

Have you found your question?
If not, contact us or send us your question via the online form.

(267) 702-2815

info-us@dlubal.com

RSTAB Concrete Structures
FOUNDATION Pro 8.xx

Add-on Module

Design of single, bucket and block foundations

Price of First License
760.00 USD
RFEM Concrete Structures
RF-FOUNDATION Pro 5.xx

Add-on Module

Design of single, bucket and block foundations

Price of First License
760.00 USD