2055x
001146
2020-03-02

Industrial Building in the Alpes-de-Haute-Provence Department, France

The ALBYR Structures team was commissioned to design a new industrial hall in a high seismic activity region. The hall includes seven interior double-hinged frames with tapered beam ends, as well as floor levels for offices. The columns were designed to support crane girders for a 5.5-ton crane.

Structural Analysis and Modeling

Since the structure is not of an unusual shape or size, the ALBYR Structures team was able to model the 3D building in RFEM to generate the wind and snow loads automatically. Parametric modeling was used for all frame geometry to allow for quick changes. The engineers generated the crane load cases in Excel for direct import into RFEM. Additionally, the RFEM add-on module RF-DYNAM Pro was used to generate seismic load cases.

ALBYR Structures also utilized the RF-STABILITY add-on module to calculate exact column effective lengths, which were imported into the RF-STEEL EC3 design module. Afterwards, it was possible to verify and optimize all members with the RF-STEEL EC3 design module.



Project Specifications

Model data

Number of Nodes 214
Number of Lines 258
Number of Members 258
Number of Load Cases 101
Number of Load Combinations 3
Number of Result Combinations 30
Total Weight 53.968 tons
Dimensions 123.23 x 67.26 x 41.27 feet
Program Version 5.20.01

Do you have any questions?