Flap Gate Sluice of Niederfinow Boat Lift, Germany

Customer Project

Structural Engineering Ingenieurbüro Jürgen Ehlenz
Beckingen, Germany

Length: ~ 7.4 m | Width: ~ 10.4 m | Height: ~ 9.1 m | Weight: ~ 30 t
Number of Nodes: 3,244 | Members: 187 | Surfaces: 607 | Materials: 1 | Cross-Sections: 3

The steel structure of a sluice with flap gate is a part of the new Niederfinow boat lift on the Oder-Havel Canal in Germany, that has been built due to the increasing traffic on the canal as the original structure of the oldest working boat lift in Germany was running near to its capacity.


The sluice gate is based on pressure used to control the water level of a weir. The flap's width is 7 m, the total width of the construction is 10.4 m. It is possible to dam up water to a maximum height of 5.6 m.

The calculated structure consists of 3,244 nodes, 6 solids, 607 surfaces and 187 members with 7 different cross‑sections. The object has a total weight of approximately 20 tons and is made of steel S 355.

Program Used for Structural Analysis

Contact us

Contact to Dlubal

Do you have any questions or need advice?
Contact us or find various suggested solutions and useful tips on our FAQ page.

+49 9673 9203 0