Steel Roofs and Bridge of Sheremetyevo Airport in Moscow, Russia

Customer Project

Structural Engineering Structural design and analysis:
B+G Ingenieure Bollinger und Grohmann GmbH
Westhafenplatz 1
D-60327 Frankfurt am Main, Germany
Dmitri Pshenichnikov
Main contractor for projecting roofs and roofing:
Stahlbau Arnold AG
Industriestrasse 6-10
D-61381 Friedrichsdorf, Germany
Steel construction for main arch:
Heinrich Lamparter Stahlbau GmbH & Co. KG
Leipziger Straße 12-18
D-34260 Kassel / Kaufungen, Germany
Steel construction for bridge:
Müller Offenburg GmbH und Co. KG
D-60327 Frankfurt am Main, Germany

Because of modernization and increased passenger capacity, the third terminal was built at the Sheremetyevo International Airport.

The Dlubal Software customer B+G Ingenieure Bollinger and Grohmann GmbH from Frankfurt am Main, Germany, was responsible under the direction of the Arnold AG for the planning of several projecting roofs and a pedestrian bridge connecting a car park and the terminal.

The architect's 3D model consisted of a bow (main arch) with long span lengths, stretched from the terminal to the parking deck, and a bridge suspended from the arc. Though the bridge has its own arched supporting structure, due to various deformations of single structural components stressed by load, vertical cables were used additionally.

Contact us

Contact to Dlubal

Do you have any questions or need advice?
Contact us or find various suggested solutions and useful tips on our FAQ page.

+49 9673 9203 0