Customer Projects

Download Customer Projects Brochure

Customer Projects designed by Dlubal Software products

You can download the collection of interesting projects designed by Dlubal Software programs in a PDF file under the following link.

Publish Your Project

Submit Customer Project

You are very welcome to present your project on the Dlubal Software website and benefit from this.

Why Dlubal Software?

Solutions

  • More than 25,000 users in 71 countries
  • One software package for all application areas
  • Short learning time and intuitive handling
  • Service provided by experienced engineers
  • Excellent price/performance ratio
  • Flexible modular concept, extensible according to your needs
  • Scalable license system with single and network licenses
  • Proven software used in many well-known projects

Hervester Bridge No. 423 Across the Wesel-Datteln Canal

Planning and Structural Design grbv Ingenieure im Bauwesen GmbH & Co. KG
www.grbv.de

The new bridge replaces the existing Hervester Bridge No. 423, which was classified as dilapidated. After the assembly at the bank, it was pushed over the Wesel-Datteln Canal step by step. A pontoon boat was used here to move the structure to the other bank.

Wildlife Crossing AM2 in Carinthia, Austria

Geometry Optimization and Structural Analysis Technische Universität Wien
Institute of Structural Engineering
www.tuwien.ac.at

The wildlife crossing AM2 has been built with a construction method for concrete shell structures called Pneumatic Forming of Hardened Concrete (PFHC). This new method has been developed by the TU Wien in the context of the research project "Double Curved Shell Structures".

Awning of Filling Station in Douala, Cameroon

Design and Structural Analysis CASTI GROUP
Cameroun
www.casti.cm/

The new awning for the filling station of GULFIN Cameroun in Douala, an oil company, is a particular structure with eccentric columns and non-symmetric cantilevered 6.5 m long beams.

Look-Out Tower at Treetop Path Steigerwald

Planning, Structural Engineering, Construction WIEHAG GmbH
www.wiehag.com

The look-out tower with a height of over 40 m is located in Ebrach (Upper Franconia), in the heart of the Steigerwald. The Steigerwald is after the Spessart the second largest deciduous forest area in Bavaria. 300-year-old beeches, amongst the oldest in Germany, soar into the sky with more than 40 metres.

Ester Tower in Jerusalem, Israel

Structural Analysis TIMBER DESIGN s.r.o.
Ing. Zbyněk Šrůtek (timber, steel, ETFE membranes)
Česká Skalice, Czech Republic
www.timberdesign.cz

Prof. Ing. Michal Bar Ilan (foundations)
Israel

A wooden lookout tower called Ester, designed by the renowned Czech architect Martin Rajniš, was inaugurated in Jerusalem in mid-November 2017. The tower in the shape of a blooming cactus is located in the gardens of a former hospital, built in 1887, not far from the walls of the Old City, offering visitors a spectacular view over Jerusalem.

Crossrail Station Abbey Wood, London, United Kingdom

Structural Analysis Timber Construction enartec - engineering  + architecture, Italy
www.enartec.it
Timber Construction Prefabrication, Work Planning  and Assembly WIEHAG Holding AG, Austria
www.wiehag.com

With the Crossrail railway line in Great Britain, one of the biggest infrastructure projects of Europe is in progress. The construction costs for the 118‑kilometre railway line amount to about €21 billion. It runs from Reading in Berkshire in the West to Shenfield in Essex in the East crossing through the centre of London.

A branch line runs under the Thames to Woolwich and ends at the recently completed Abbey Wood Station. Its extraordinary timber roof construction has the shape of a huge manta ray which seems to hover above the station.

Free-Form Glass Structure at Xujiahui Commercial Center in Shanghai, China

Investor Sun Hung Kai Properties
www.shkp.com

A remarkable free‑form roof structure was built at the Xujiahui Commercial Center in Shanghai, China, and inaugurated in June 2017. It serves as a skylight in the indoor area of the shopping center, and as a canopy in the outdoor area.

John W. Olver Design Building University of Massachusetts, USA

Investor University of Massachusetts Building Authority
Boston, MA, USA
www.umass.edu

In September 2017, the Design Building at the University of Massachusetts in Amherst was completed. The $52 million project is one of the largest timber structures in the USA and one of the largest wood-concrete composite projects in the world.

Residential Timber Buildings in Strasbourg, France

21 December 2017 France RFEM
Structural Analysis Ingénierie Bois
Bischheim, France
www.ingenieriebois.fr

Nowadays’ mastery of design methods and fabrication techniques of CLT panels allow for easier design and construction of high‑rise timber buildings.

‘Îlot bois de Strasbourg’ is one of the first CLT building project in France that exceeds 30 m in height. This building complex consisting of three high‑rise buildings provides commercial premises on the ground floor and 146 residential units on the upper floors. The entire structure has a total area of 9,300 m².

Revitalization and Extension of Supporting Structure of Stage Roof in State Playhouse Dresden, Germany

Investor Saxonian Real Estate and Construction Management
Dresden, Germany
www.sib.sachsen.de

The theatre built from 1911 to 1913 has a varied history. The building was destroyed by the Allied air attacks in February 1945, reconstructed in the post‑war years, and damaged by floods in August 2002. Within an 18‑week break, the Dresden theatre has been was extensively renovated and modernized.

11 - 20 of 185

Search


Designed with


Industry

Newsletter

Receive information including news, useful tips, scheduled events, special offers, and vouchers on a regular basis.

Successful Project with RFEM and RSTAB

“The art project 'Solhjul' was designed with the programs RSTAB and RFEM. The great support by Dlubal Software contributed to the success of the project.”


Project: Art Project "Solhjul" in Give, Denmark

Reduced Costs Thanks to Dlubal Software

“We could perform a very satisfying structural analysis of our project. We were able to reduce our material costs, we are excited.”