水利建筑阀门,德国

客户项目

Structural Engineering Ingenieurbüro Jürgen Ehlenz
Beckingen, Germany
www.ibehlenz.de

Length: ~ 7.4 m | Width: ~ 10.4 m | Height: ~ 9.1 m | Weight: ~ 30 t
Number of Nodes: 3,244 | Members: 187 | Surfaces: 607 | Materials: 1 | Cross-Sections: 3

The steel structure of a sluice with flap gate is a part of the new Niederfinow boat lift on the Oder-Havel Canal in Germany, that has been built due to the increasing traffic on the canal as the original structure of the oldest working boat lift in Germany was running near to its capacity.

Structure

The sluice gate is based on pressure used to control the water level of a weir. The flap's width is 7 m, the total width of the construction is 10.4 m. It is possible to dam up water to a maximum height of 5.6 m.

The calculated structure consists of 3,244 nodes, 6 solids, 607 surfaces and 187 members with 7 different cross‑sections. The object has a total weight of approximately 20 tons and is made of steel S 355.

Program Used for Structural Analysis

联系我们

联系 Dlubal

如果您有任何关于我们产品的问题或者建议,请联系我们的技术支持或者搜索我们的问题和解答 (FAQs)。

+49 9673 9203 0

(可要求接中文热线)

info@dlubal.com