Hervester Bridge No. 423 Across Wesel-Datteln Canal
  • 3D Viewer
  • 3D Viewer | Babylon
  • Virtual Reality
Moving New Bridge Parallel to Existing Bridge (© grbv)
  • 3D Viewer
  • 3D Viewer | Babylon
  • Virtual Reality
Hervester Bridge No. 423 Across Wesel-Datteln Canal
Moving New Bridge Parallel to Existing Bridge (© grbv)
2024-03-09
011850
  • RFEM 5
  • RSTAB 8

Hervester Bridge No. 423 Across Wesel-Datteln Canal

Used in
  • Steel Bridge Structure
3D Model
No Download Possible Customer Project / View Only
More About 3D Model
  • Steel Bridge Structure
Specifications
Number of Nodes 190
Number of Members 342
Number of Load Cases 28
Number of Result Combinations 23
Total Weight 460.213 tons
Dimensions (Metric) 75.459 x 13.990 x 13.644 m
Dimensions (Imperial) 247.57 x 45.9 x 44.76 feet
Program Version 8.14.01
Share
2024-05-30
011884
  • RSTAB 8
  • STEEL 8
  • SHAPE-THIN 8
    • SUPER-RC 8
    • Bridges
    • Steel Structures
Moving New Bridge Parallel to Existing Bridge (© grbv)
Used in
  • Hervester Bridge No. 423 Across the Wesel-Datteln Canal
3D Model
No Download Possible Customer Project / View Only
More About 3D Model
  • Steel Bridge Structure
Specifications
Number of Nodes 190
Number of Members 342
Number of Load Cases 28
Number of Result Combinations 23
Total Weight 460.213 tons
Dimensions (Metric) 75.459 x 13.990 x 13.644 m
Dimensions (Imperial) 247.57 x 45.9 x 44.76 feet
Program Version 8.14.01
Share