To ensure a smooth installation in the West Neutron Guide Hall (radiation protection area), the entire steel structure was pre-assembled at the steel construction company, inspected, and accepted by the client.
To ensure a smooth installation in the West Neutron Guide Hall (radiation protection area), the entire steel structure was pre-assembled at the steel construction company, inspected, and accepted by the client.
2026-04-07
062147
  • RFEM 6

Pre-Assembly Work in the Steel Construction Company's Hall (Feckl)

To ensure a smooth installation in the West Neutron Guide Hall (radiation protection area), the entire steel structure was pre-assembled at the steel construction company, inspected, and accepted by the client.

The structure was then systematically dismantled and prepared for delivery to FRM II. Photo by © Peter Feckl Maschinenbau GmbH