Detailed view of the steel launching nose connected to the bridge box girder with equivalent stress distribution visible on surfaces.
  • 3D Viewer | Google
  • 3D Viewer | Babylon
  • Realtà virtuale
Detailed view of the steel launching nose connected to the bridge box girder with equivalent stress distribution visible on surfaces.
2025-04-11
056215
  • RFEM 6

Connection Detail Between Launching Nose and Bridge Box Girder

Detailed view of the steel launching nose connected to the bridge box girder with equivalent stress distribution visible on surfaces.

This image depicts the intricate connection detail between a steel launching nose and a bridge box girder, highlighting the equivalent stresses distributed across the surfaces. The model is a product of RFEM software expertise by engineers Petr Nečesal and David Marván from PIS PECHAL, s.r.o.
  • Steel connection
  • Bridge box girder
  • Equivalent stress
  • RFEM model
  • Structural engineering
Usato in
  • Verifica dell'avambecco in acciaio per la sovrastruttura del ponte sull'autostrada D35
Modello 3D
Non è possibile scaricare Progetto cliente / Solo visualizzazione
Ulteriori informazioni sul modello 3D
  • Trave a sbalzo in acciaio per l'avambecco del ponte in calcestruzzo | D35
Specifiche
Numero di nodi 744
Numero di linee 1140
Numero di aste 978
Numero di superfici 20
Numero di casi di carico 172
Nr. di combinazioni di carico 135
Nr. di combinazioni di risultati 5
Peso totale 111,432 t
Dimensioni (metriche) 40.420 x 5.400 x 4.467 m
Dimensioni (imperiali) 132.61 x 17.72 x 14.66 feet
Versione del programma 5.36.01
Condividi