The individual wall surfaces were staggered from floor to floor and include big openings in addition.
It was not possible to base the wall surfaces to the foundation partially, so they had to be supported by columns in the underground parking floor and passed into the building ground by elastic foundation.
The unusual calculation method caused significant cost-efficient results.
结构设计 | Baustatik建筑工程师Anton Rohmer Straßäckerweg20 88471 Laupheim,德国 电话: 07392-10011 传真: 07392-10012 |