256x
002744
2024-01-16

Batch Calculation for Multiple Wind Directions

RWIND 2 provides the feature of the automatic generation of simulations for multiple wind directions and the subsequent batch calculation of them. This option was and still is available in RFEM 6 / RSTAB 9, but now it is also available in the RWIND 2 stand-alone program.


The procedure is as follows:

  • Prepare a project with all input parameters for the simulation and with zero rotation of the model.
  • Open the dialog box for generating copies of the project with the rotated models:
  • Start the batch calculation from "Project Manager."