AQUAtherm Indoor/Outdoor Swimming Pool in Straubing, Germany

Structures Analyzed with Dlubal Software

  • Customer Project

Customer Project

The successful general redevelopment of AQUAtherm has been providing year-round swimming pleasure in Straubing since 2021. The structure of the indoor swimming pool is something very special.

Investor Stadtwerke Straubing
www.stadtwerke-straubing.com
Architect Studio Gollwitzer Architekten GmbH
www.studioga.de
Structural Analysis
Ingenieurbüro Baumruck + Oswald

Model Data

Model

Inspired by the lightness of water itself, the playful yet elegant steel wickerwork invites visitors to leave everyday life behind for a few hours in any weather.

With the general redevelopment of the indoor swimming pool, AQUAtherm in Straubing has become an adequate all-weather swimming paradise. After several renovations and extensions in the past, the new structural design with its organic steel wickerwork is now particularly eye-catching.

The structure, consisting of steel and reinforced concrete, extends over numerous swimming areas where the lighting system provides a wide variety of lighting moods due to the elegant, playful steel design. Whether the water slide tower, the big swimming pool, the bistro, the new water playground or the free steam sauna: There is room for everything.

Structure

The steel wickerwork consists of round tubes of the Ro 139.7x8.0 and Ro 139.7x12.5 (mm) types. They were mainly bent as splines (3-D) in order to achieve a pleasing organic look. In addition, the structural system extends the indoor swimming pool area on the long side.

A particular challenge during redevelopment, especially with regard to the roof structure, was the lack of documentation on previous renovations and reconstructions. Therefore, the existing swimming pool roof had to be analyzed in advance because of additional loads resulting from the roof renovation in 2008, as there were no structural documents available for these additional loads.

Using Dlubal software, the German engineering office for structural analysis and building construction BAUMRUCK + OSWALD calculated the steel and reinforced concrete structure. After providing the redevelopment plans in 2018, the building was officially opened at the end of 2021. Since then, it has been inviting hundreds of visitors every day to leave everyday life behind for a few hours.

Steel and reinforced concrete show their best side as building materials, and, in combination with the incident light and interior lighting, create a special atmosphere. A really great structure!

Project Location

Wittelsbacherhöhe 50/52
94315 Straubing, Germany

Keywords

Outdoor Swimming Pool Indoor Swimming Pool Steel Reinforced Concrete

Write Comment...

Write Comment...

  • Views 661x
  • Updated 08/29/2023

Contact Us

Contact Dlubal

Do you have further questions or need advice? Contact us via phone, email, chat, or forum, or search the FAQ page, available 24/7.

(267) 702-2815

[email protected]

Buckling Analysis in RFEM 6

Buckling Analysis in RFEM 6

Webinar 09/21/2023 2:00 PM - 3:00 PM CEST

Online Training | English

Eurocode 3 | Steel Structures According to DIN EN 1993-1-1

Online Training 08/03/2023 8:30 AM - 12:30 PM CEST

CSA A23.3:19 Concrete Building Design in RFEM 6

CSA A23.3:19 Concrete Building Design in RFEM 6 (USA)

Webinar 07/27/2023 2:00 PM - 3:00 PM EDT

Online Training | English

Eurocode 2 | Concrete Structures According to DIN EN 1992-1-1

Online Training 07/27/2023 8:30 AM - 12:30 PM CEST

New Features in Steel Joints Add-On

New Features in Steel Joints Add-On

Webinar 06/29/2023 2:00 PM - 3:00 PM CEST

AISC 360-16 Steel Connection Design in RFEM 6

AISC 360-16 Steel Connection Design in RFEM 6 (USA)

Webinar 05/24/2023 2:00 PM - 3:00 PM EDT