The model shows a tunnel inlet structure made of reinforced concrete as part of the Lesotho Highlands Water Project. It includes detailed structural design by Zutari (Pty) Ltd.. The focus is on the design and construction of the tunnel inlet structure. The display provides practical insights into the choice of materials and construction methods. It is suitable for comparisons and more in-depth analyses in building engineering.
Reinforced Concrete Tunnel Inlet Structure
| Number of Nodes | 507 |
| Number of Lines | 534 |
| Number of Members | 38 |
| Number of Surfaces | 258 |
| Number of Solids | 31 |
| Number of Load Cases | 14 |
| Number of Load Combinations | 10 |
| Number of Result Combinations | 1 |
| Total Weight | 10074,750 t |
| Dimensions (Metric) | 24.408 x 21.768 x 24.000 m |
| Dimensions (Imperial) | 80.08 x 71.42 x 78.74 feet |
| Program Version | 5.27.01 |