224x
001455
2026-09-17

Temporary Steel Structure for Securing Catenary Pole in Porto, Portugal

As part of construction work on a railroad line, a temporary support structure was designed to suspend a catenary pole. The steel structure allows for subsequent work to be carried out in the area of the pole’s original location, where an underground tunnel for another railroad line is being built.

The structure, with a total length of 21 m (69 ft), consists of several steel modules supported at their ends on reinforced concrete foundations. The individual modules were assembled primarily from HEB cross-sections. The connections within a module consist of welded joints, while the connections between the individual modules are made of bolted joints. The suspension structure is also attached to the catenary poles using bolted connections.

The structural analysis software RFEM 6 was used for the modeling and structural analysis of the steel structure. The Steel Design add-on was used to perform the serviceability limit state (SLS) and the ultimate limit state (ULS) design checks according to Eurocode 3. In addition, the Steel Joint add-on was used for the detailed analysis and design of the steel connections.

Location Porto,
Portugal
Manufacturing and Assembly
Structural Design


Project Specifications

Model Data

Number of Nodes 82
Number of Lines 95
Number of Members 95
Number of Surfaces 0
Number of Solids 0
Number of Load Cases 4
Number of Load Combinations 3
Number of Result Combinations 0
Total Weight 12.974 t
Dimensions (Metric) 21.428 x 13.698 x 2.063 m
Dimensions (Imperial) 70.3 x 44.94 x 6.77 feet