The dome roof covers an API 650 water tank with an 8.5-meter (28-foot) high tank shell. The structure consists of approximately 1,980 aluminum members connected by around 600 bolted hub connections. The roof cladding comprises 990 triangular aluminum panels, supplemented by battens and domed cover plates at the connection nodes. The entire dome is designed as a bolted assembly, eliminating the need for welding.
Compared to an equivalent steel roof weighing approximately 500 t (551 US tons), the aluminum dome weighs around 40 t (44 US tons). This reduction of more than 90% significantly reduces the permanent loads acting on the tank shell and foundation. The lightweight components also simplify transportation and erection, while the bolted construction avoids the need for hot work during installation above the tank.
Hub and tension-ring connections were subsequently verified using finite-element connection analysis. The resulting connection parameters, including plate dimensions, bolt sizes, edge distances, pitches, and gauges, formed the basis for the automated connection modeling in Tekla Structures.
The double-curved geometry of a geodesic dome poses particular challenges to conventional 3D modeling. The changing member inclinations, spherical node positions, and the complex intersections of up to six struts at individual hubs require precise geometry and consistent connection detailing.
To address these challenges, NEXUS developed an AI-assisted workflow using the Model Context Protocol (MCP) to connect an AI agent directly to Tekla Structures and then to RFEM. The dome geometry was defined using natural-language instructions, enabling the agent to generate the complete geodesic wireframe in about five minutes.
Additional Tekla plugins, developed with AI assistance and validated by NEXUS engineers, automated the placement of hub plates and bolt groups, the rotation of the aluminum struts, and the generation of roof panels, battens, and hub cover plates. Changes to connection parameters could be applied consistently across all relevant nodes, reducing repetitive modeling work and the risk of detailing errors.
The workflow produced 444 fabrication drawing sheets and 12 erection drawing sheets. Component numbering, assembly information, and material lists were derived directly from the coordinated 3D model, ensuring consistency between the design, detailing, and fabrication stages.
The project shows how structural engineering expertise, automated modeling, and AI-assisted tools can be used together to improve efficiency and consistency in the design and detailing of complex aluminum structures.
| Location | Al-Kharj, Saudi Arabia |
| Client | National Water Company |
| Consultant | Ayesa Engineering and Architecture SA |
| Main Contractor | International Fedak Company |
| Tank Fabricator | Saudi Hadaid Factory |
| Structural Analysis | NEXUS |