This project deals with structural evaluation against climatic loads and the utilization and seismic analysis of an existing telecommunications tower performed by SAQQARA INGENIERIA S.L., a customer of Dlubal Software. The structure is a lattice tower with a square section plan, made of steel cross-sections, with a radar and the necessary auxiliary equipment installed on it, including a spherical radome as a mimicry.
Madergia, a Spanish Dlubal Software customer, presents this beautiful project designed by ZÜR Studio, for which engineers were responsible with regard to the structural analysis, manufacturing, supply, and installation of the timber structure. It is a pergola roof with folded plates, placed in an open public space in the town of Anoeta.
SIDO Madera, a Spanish Dlubal customer, has designed a 21-meter-long (69 ft) bicycle-pedestrian bridge located in Orihuela, Alicante, Spain. It is made of GL24H pine timber, treated by autoclave with copper salts. In addition, hot-dip galvanized S235 steel fasteners were used.
A developer project of 121 apartments in 2 identical buildings for rent with an area of 53,820 ft² each, designed by CIP ARQUITECTOS SL, was built by the construction company ACR in just 13 months of construction, including earthworks, foundations, and basement, using the industrialized Steel Framing system by AFCA Teccon, a customer of Dlubal Software.
Our client, Maderas Besteiro, was in charge of drafting this emblematic project (structural analysis and design), involving the manufacture of all pieces, a numerical control, subsequent treatment, and finally, assembly management.
The SDEA Engineering Solutions Advanced Engineering department has extensive experience in mechanical-structural analysis using the finite element method for various structure types and equipment for different industrial sectors such as steel, metalworking, oil and gas, energy, railroads, and metallurgy, among others, as well as for the construction sector.
The Ritz Hotel is a 5-star luxury hotel located in Madrid. It was built by King Alfonso XIII in 1910 as a royal hotel. After more than 100 years in service, it is currently undergoing complete renovation.
Dlubal's Spanish customer Estudi M103, an architectural office for structural consulting and calculation reports located in Barcelona, participated in an extraordinary construction project. The "Cirerers" project arises from a contest for municipal building sites for cohousing published by the Barcelona City Council in 2016.
Dlubal customer Estudi M103, an architecture office for structural consulting and calculation reports, was commissioned to carry out the structural consulting of the first office building built entirely of wood in Spain, using Dlubal RFEM software. It is an office building with a ground floor and 4 above-ground stories, located on Calle Llacuna 42 in Barcelona. With this type of building, construction periods are shortened due to the use of new sustainable materials, and even carbon emissions are reduced by 50% during construction.
On the Mediterranean island of Formentera, a new cross-laminated timber building was constructed, which is used by a sailing school and a water sports center. The one-story building consists of two separate sections that are connected by low-lying glued-laminated beams in the roof area.
Dlubal customer Maderas Besteiro is a third-generation family-owned company focusing on timber-based construction and manufacturing. The company's driving value of providing socially and environmentally sustainable houses to the local community has shown itself once again.
EGOIN SA was awarded a timber design project for 35 new CLT apartments in Girona, Spain. Cross-laminated timber (CLT) was selected as the building material due to its sustainability, ability to filter CO2, and architectural design freedom.
Removable guyed masts are used not only for telecommunications purposes, but also for collecting wind data in order to evaluate the profitability of a planned wind farm. These removable and permanent towers can reach heights of up to 492 ft and are mounted at the planned windmill height in uninhabited areas.
The chapel adjoining the old convent of San Pedro in Lugo, Spain is an original construction dating back to 1690. Its ancient roof structure was based on trusses simply supported in putlog holes located in the main wall of the church. Damage appeared here. Over time, the lower vault of the structure deteriorated to the point of limiting access to the interior.
The renovation consisted of completely replacing the roof in order to make the space below fully usable again and to provide natural light to the main temple room through the stunning church windows. Previously, the windows were boarded up in order to support the roof trusses.