In 2016, NEDCON received an assignment to install the steelwork for two fully-automated distribution centers for two supermarket companies. One distribution center is located in Michigan and the other distribution center is in Alberta, Canada.
To perform renovations of the steeple of the St. Martinus parish in Kerpen, Germany, a scaffold was required. The designers had to meet a special challenge, as the frame construction had to be set up at the spire top without applying pressure anchors, which are usually used in scaffolding.
The grate scaffolding of the biomass power plant in Berlin-Neukölln, Germany, is a structure with a high temperature load.
The engineering office of Jürgen Ehlenz from Beckingen, a long-time Dlubal customer, was responsible for the structural analysis of the grate scaffolding with moving parts, as well as for the construction and design of the piping.