500x
000217
2005-07-01

Composite Bridge According to DIN Technical Reports

In this diploma thesis, the essential design checks according to DIN technical reports 101 to 104 are applied to a composite bridge.

Author
Than Nguyen Quoc
University

The thesis presents a four-span motorway composite bridge made of a box girder and an overhead concrete belt with the total length of 172 m. The box girder is designed as a welded plate girder.


Downloads


;