This challenging project includes the new boiler house for Melamin d.d. Kočevje, equipped with a fully functional 9.8 MW biomass plant. The complicated installation was carried out next to an old steam boiler that was still in operation. The model shows the deformation shape of the structure in RFEM. For more information, see ag-i.si. Model and deformation shape © AG-inženiring.
Steel Structure of Boiler House for Biomass Plant
No Download Possible
Customer Project / View Only
| Number of Nodes | 266 |
| Number of Lines | 555 |
| Number of Members | 532 |
| Number of Load Cases | 9 |
| Number of Load Combinations | 94 |
| Number of Result Combinations | 2 |
| Total Weight | 50.517 t |
| Dimensions (Metric) | 22.267 x 22.228 x 15.715 m |
| Dimensions (Imperial) | 73.05 x 72.93 x 51.56 feet |
| Program Version | 4.10.19 |