The local political desire was to use sustainable materials for the new building. The district residents voted for a green roof to be included in the project.
The engineering office ARTEMIS INGENIEUR accompanied the project management team in the planning of the building in the phases of preliminary design, design, and the preparation of the tender documents. ARTEMIS INGENIEUR was responsible for the design of the supporting structure, including the definition of the stiffening principle and the dimensioning of the supporting elements.
ARTEMIS ENGINEER
www.artemis-ingenieur.fr
3D model of a new nursery school building in RFEM (© ARTEMIS INGENIEUR)
The engineering office ARTEMIS INGENIEUR accompanied the project management team in the planning of the building in the phases of preliminary design, design, and the preparation of the tender documents. ARTEMIS INGENIEUR was responsible for the design of the supporting structure, including the definition of the stiffening principle and the dimensioning of the supporting elements.
ARTEMIS ENGINEER
www.artemis-ingenieur.fr
3D model of a new nursery school building in RFEM (© ARTEMIS INGENIEUR)
Timber Supporting Structure
No Download Possible
Customer Project / View Only
Number of Nodes | 163 |
Number of Lines | 253 |
Number of Members | 219 |
Number of Load Cases | 7 |
Number of Load Combinations | 74 |
Number of Result Combinations | 3 |
Total Weight | 3.877 tons |
Dimensions (Metric) | 52.832 x 35.646 x 3.510 m |
Dimensions (Imperial) | 173.33 x 116.95 x 11.52 feet |
Program Version | 5.19.01 |