The four-story office building welcomes visitors, members, and employees of the AmperVerband company in its modern premises. The entrance area of the partially glazed facade includes inclined, V‑shaped composite steel columns spanning two floors.
The stand-alone program RWIND allowed Davide Prando (architect) and Marco Rota Nodari (engineer) to optimize the project, highlighting some critical locations on the buildings' surfaces, due to the high positive and negative pressure values encountered.
For many years, VM Architettura Integrata has been involved in the design of rainscreens for buildings of considerable size; in this particular case, the collaboration between Arch. Davide Prando and Eng. Marco Rota Nodari has enabled the further development of wind flow analyses, examining two towers with heights of about 393 ft and 295 ft (120 m and 90 m), respectively, in a digital wind tunnel.
The building is located on avenue Melchor Ocampo, Tercera Sección, in El Espinal, Oaxaca, Mexico. It is a building with a pharmacy on the ground floor and medical offices on the upper floors with partitions made of lightweight material.
Dlubal's Spanish customer Estudi M103, an architectural office for structural consulting and calculation reports located in Barcelona, participated in an extraordinary construction project. The "Cirerers" project arises from a contest for municipal building sites for cohousing published by the Barcelona City Council in 2016.
This 7-story building, with 57,048.73 ft² of floor space, is used as a vocational school. The dimensions (length x width x height) are approximately 150.92 ft x 65.62 ft x 71.52 ft.
Dlubal customer Estudi M103, an architecture office for structural consulting and calculation reports, was commissioned to carry out the structural consulting of the first office building built entirely of wood in Spain, using Dlubal RFEM software. It is an office building with a ground floor and 4 above-ground stories, located on Calle Llacuna 42 in Barcelona. With this type of building, construction periods are shortened due to the use of new sustainable materials, and even carbon emissions are reduced by 50% during construction.
JCR Estructural designed this residential building located in the city of Los Mochis, in the state of Sinaloa, Mexico. The house is divided into two areas: the main area where the residential spaces are, and an independent area in the garden, for recreational use.
Europlaza Movilidad is an 86,111 ft2 building that includes a bank branch, the Federal Government's Mobility Secretariat, and the State Government's Public Works Secretariat. It has parking space in the basement and offers seven above-ground stories of office space. The roof is used for air-conditioning equipment. The building is located in Villahermosa, the capital of the state of Tabasco, Mexico.
High Point "E" is a residential building with approximately 107,639 ft² of living space (13-story residential building on a 2-story base structure with a 2-story underground parking garage).
This project was designed using BIM technology. During the documentation process, IFC files were used for the data exchange. The architectural building model was first created in REVIT, then exported to RFEM to apply loads and complete the full structural analysis and design.
The ALBYR Structures team was commissioned to design a new industrial hall in a high seismic activity region. The hall includes seven interior double-hinged frames with tapered beam ends as well as floor levels for offices. The columns were designed to support crane girders for a 5.5-ton crane.
To meet the needs of its citizens, the city of Donzère decided to build a sports hall on a large triangular island, at the foot of the historic village. The new structure, dedicated to local schools and clubs, created the opportunity for sports event practice and competitions.
This single-story, 11,840 ft² nursery school accommodates up to 70 children. The building property is also surrounded by playgrounds and other green spaces.
The school building addition in Sutz-Lattrigen was built on the existing foundation floor. This foundation was not designed to withstand a second story. Therefore, the loads from the first floor and the additional second story had to be designed as concentrated loads. In order to reduce the weight but also for educational and sustainability reasons, timber was used in the construction of the new building.
The recent trend in high-rise construction is clearly dominated by timber as the most ecological and environmentally-friendly material. The project promoter Nexity Resolutely is committed to constructive building solutions with a reduced carbon footprint through various labels and certifications included in its several office and commercial timber projects.
Among these is the Palazzo Meridia, which is currently the tallest CLT office building in France. Dlubal customer CBS-Lifteam was responsible for the planning, supply, and installation of the timber structure.
With an area of 110,000 ft², the North Surrey Sports and Ice Complex includes three ice rinks, event rooms, and restaurants, as well as outdoor areas.
StructureCraft, a customer of Dlubal Software, was selected as the structural engineer and builder of the roof structure for this exciting local project in Surrey, Canada, after proposing a turnkey, value-engineered solution in late 2017.
After more than 2 1/2 years of construction, the world’s highest 3S cableway, "Matterhorn glacier ride", opened at the end of September 2018. The $55 million project was developed to increase passenger capacity to the Klein Matterhorn, at an altitude of 12,802 ft. Additionally, it is now possible to keep the service running when performing maintenance work on the existing tramway.
Following remodeling, the TD Place Stadium in Canada’s capital, Ottawa, can hold up to 24,000 visitors. The sports complex is located at Lansdowne Park and is primarily used for Canadian football and soccer. The architectural highlight of the stadium is the curvilinear timber veil.
The modular structure of the school will only remain at the present location for eight years. After this period, 36 timber modules, including the screw foundations, will be removed entirely and reconstructed at another location. Therefore, a completely new configuration of the floors and the ground plan design will be possible. The simple yet functional structure includes the architectural highlight of a front-facing flight of stairs constructed with timber truss girders.
The St. Josef Church in Holzkirchen project comprises the main church and a chapel, which are connected by a common foyer with the sacristy. The foyer area and the sacristy were built as a reinforced concrete building. The main church and chapel are differently sized timber structures and take the form of inclined truncated cones with an elliptical footprint.
The new roofing system for the GULFIN Cameroun oil company's filling station in Douala is a particular structure with eccentric columns and non-symmetric cantilevered 21-foot-long beams.
With the Crossrail railroad line in Great Britain, one of the biggest infrastructure projects of Europe is in progress. The construction costs for the 73-mile railroad line amount to about €21 billion. It runs from Reading in Berkshire in the west to Shenfield in Essex in the east, crossing through the center of London.
A branch line runs under the Thames to Woolwich and ends at the recently completed Abbey Wood Station. Its extraordinary timber roof construction has the shape of a huge manta ray which seems to hover above the station.
In September 2017, the Design Building at the University of Massachusetts in Amherst was completed. The $52 million project is one of the largest timber structures in the USA and one of the largest timber-concrete composite projects in the world.
Modern design methods and fabrication techniques of CLT panels allow for easier design and construction of high‑rise timber buildings.
“Îlot bois de Strasbourg” is one of the first CLT building projects in France to exceed 98 ft in height. This building complex, consisting of three high‑rise buildings, provides commercial space on the ground floor and 146 residential units on the upper floors. The entire structure has a total area of 100,104 ft².
The theater, built in 1911-1913, has a varied history. The building was destroyed by Allied air attacks in February 1945, reconstructed in the postwar years, and damaged by floods in August 2002. Within an 18‑week break, the Dresden theater was extensively renovated and modernized.
In Roost, Luxembourg, a new building complex is being built that relates to cars. Up to six car dealerships, a parking area, and a paint shop will be built on the site. The construction project was divided into two planning phases. The first phase includes three multi-story car dealerships. They have the same supporting structure.
At a height of around 6,889 ft you can enjoy a breathtaking view of the Dolomites with a delicious meal. Since 2016 these amenities have been available at the top station of the Obereggen skiing area, South Tyrol. The Oberholz alpine hut restaurant, with its exceptional architecture, fits perfectly into the surrounding landscape.
More and more cities and towns, especially in southern Germany, are open to multi-story timber buildings. The German city of Friedrichshafen on Lake Constance was convinced of the apartment building concept by the wood construction company Müllerblaustein Holzbau GmbH.