The transition to more sustainable energy sources is a global priority today. In this sense, the construction of a multi-energy station in Les Sables-d'Olonne, in the Vendée department (85), is an innovative and promising project. This station, consisting of three canopies with a height of 7.5 m (24.5 ft) and a total length of 40 m (131 ft), represents a significant investment to promote low-carbon mobility and local green energy. GH Hervouet, a customer of Dlubal Software, was responsible for the entire project, including carpentry, roofing and cladding.
In June 2023, a roof of the amphitheater of the Municipal Theater in Most was successfully completed. The membrane structure has been specially designed to provide protection from the sun and rain above the stage, while making the entire space a visual attraction. The author of the design is Carl Stahl & spol.; the calculation was carried out using the programs RFEM 5 and RWIND 2.