The Better Energy project is a fascinating charging station that shows the future of green mobility infrastructure by combining best practices from the energy, ecology, and construction industries.
The building has a floor area of about 5,812 ft² and is intended for storage. The complex is divided into 10 different units, with common access from the inner courtyard, each equipped with a mezzanine for storing goods or equipment.
This project is about the construction of an elevator shaft to replace the existing staircase and provide access to the underpass. The shaft was made of surface components consisting of reinforced concrete, ensuring its stability and durability with control of cracking at the same time.
The Airedale swing bridge is the largest manually operated steel swing bridge in the UK. It provides access to a newly built housing development on the outskirts of Leeds.