1670x
004297
2019-12-20

Entering Earth Covering of Bucket Foundation in RF-/FOUNDATION Pro

How can I enter the earth covering of a bucket foundation up to 10 cm below the top edge of the bucket in RF‑/FOUNDATION Pro?


Answer:

In RF‑/FOUNDATION Pro, you can do this by defining the soil profile.

In Window "1.1 General Data", you can find the button that opens the dialog box for defining the soil profile.

In the "Soil Profile" dialog box, you can then set the soil level interface PGE and PGL.

Important:
The profile grade line must not be higher than the profile ground elevation.

In the case of a bucket foundation, PGE or PGL refers to the upper edge of the bucket.


Author

Mr. Kieloch provides technical support to our customers and is responsible for development in the area of reinforced concrete structures.

Downloads


;