The 39 m span of the canopy is achieved with two double-layer HSS beams that run over the main V-shaped columns. The double HSS beams were welded together in three segments. Each segment was connected with a concealed bolted connection in order to achieve high-quality fabrication in the factory.
The V-shaped columns and branches help to reduce the span of the main beams and the purlins of the canopy with the longest spans. A multicolored glass panel is placed on the steel, creating impressive shadows on the floor as the sun moves across the sky.
| Location | 4335 Glendale Milford Rd, Blue Ash, 45242 Ohio, USA |
| Design & Construction | Novum Structures LLC |
| Architect | MSA Architects |