The Airedale swing bridge is the largest manually operated steel swing bridge in the UK. It provides access to a newly built housing development on the outskirts of Leeds.
The Better Energy project is a fascinating charging station that shows the future of green mobility infrastructure by combining best practices from the energy, ecology, and construction industries.
A particularly exciting customer project is the high-speed toll station by Jiangsu Jingong Space Structure Co., Ltd. In this project, a membrane is supported by an innovative arch truss, which has an interesting appearance and also special properties.
This project is about the construction of an elevator shaft to replace the existing staircase and provide access to the underpass. The shaft was made of surface components consisting of reinforced concrete, ensuring its stability and durability with control of cracking at the same time.
A membrane structure will elegantly span the grandstand on the East Campus of the Xuzhou University of Technology. The structure was designed by Jiangsu Jingong Space Structure Co., Ltd.