This project is part of a group of 16 chosen to participate in a two-year pilot of “CaGBC’s Zero Carbon Building Standard” which will help to further refine the standard, plus accompanying resources and education.
The Technical University of Munich is currently undertaking the construction of a new laboratory building on its campus with the intention of further advancing state-of-the-art research. Not only is the building's purpose forward-thinking, but so is its sustainable construction.
The Better Energy project is a fascinating charging station that shows the future of green mobility infrastructure by combining best practices from the energy, ecology, and construction industries.
The Airedale swing bridge is the largest manually operated steel swing bridge in the UK. It provides access to a newly built housing development on the outskirts of Leeds.
This project is about the construction of an elevator shaft to replace the existing staircase and provide access to the underpass. The shaft was made of surface components consisting of reinforced concrete, ensuring its stability and durability with control of cracking at the same time.