The stand-alone program RWIND allowed Davide Prando (architect) and Marco Rota Nodari (engineer) to optimize the project, highlighting some critical locations on the buildings' surfaces, due to the high positive and negative pressure values encountered.
In June 2023, a roof of the amphitheater of the Municipal Theater in Most was successfully completed. The membrane structure has been specially designed to provide protection from the sun and rain above the stage, while making the entire space a visual attraction. The author of the design is Carl Stahl & spol.; the calculation was carried out using the programs RFEM 5 and RWIND 2.