In June 2023, a roof of the amphitheater of the Municipal Theater in Most was successfully completed. The membrane structure has been specially designed to provide protection from the sun and rain above the stage, while making the entire space a visual attraction. The author of the design is Carl Stahl & spol.; the calculation was carried out using the programs RFEM 5 and RWIND 2.
At the end of April 2023, a new aviary was completed at the Sichuan Pavilion in the Prague Zoo. The aviary structure has a length of 14 m and a width of 10 m. The company Carl Stahl & spol. created the architectural and structural design, calculated in RFEM 5.
An 88.18-ton steel structure subjected to high thermal and mechanical stresses had an obsolete fastening system that no longer met the current ergonomic requirements. The study of a new fastening system was based on specifications that required significant ergonomic improvement, certified resistance to stress, low costs, low space requirements, and ease of implementation and operation.
In May 2022, the new Sky Bridge footbridge opened in the Dolní Morava area (Czech Republic); it is the longest footbridge in the world, with a length of 2,365.49 ft. The design and construction of the footbridge were carried out by TAROS NOVA a.s., and the structural analysis was performed in RFEM 5.
This hydraulic dam project, located in the Provence-Alpes-Côte d'Azur region (PACA), included design consideration for the control valve’s rotational axis deformation, maximum stress, and material fatigue behavior.
The goal of the hydroelectric power plant project was to analyze the resistance of a double mechanical displacement system on rails subjected to tensile stress.
The project for designing a filter/dryer device, including agitator, required a complete stress and deformation analysis in RFEM. The complex modeling of the structure, which had 1,424 surfaces, 158 solids, and 425 members, represented a special design challenge.