In addition to the cruise terminal located at Berth 7, a second cruise ship check-in terminal was constructed in Warnemünde. There are occasions when three ships may call at the same time.
The expansion of the Orly Sud Airport aims at increasing the airport's capacity and increasing passenger mobility between arrivals and departures, especially for low-cost airlines. The expansion project in the south terminal was initiated by the company Groupe ADP.
The "Hemsedal Ski Center" in the Scandinavian Alps is one of the top 3 ski resorts in Norway. It comprises a total of 49 ski slopes and 20 surface lifts. At the foot of the mountainside, a new apartment hotel with 100 modern rooms will be completed by the end of 2017.