In order to use the working window area for graphical input of model data or for result evaluation in an optimum way, there are various options for arranging the Project Navigator, the table and the result panel.

1. They can be completely deactivated by using the toolbar or the [X] button in the title bar of the dialog box

2. You can dock them to the title bar of the dialog box at any edge of the screen by using the drag-and-drop function. 2.for there are docking icons in the center of the screen. If a dialog box is dragged onto one of these docking points, it adjusts between existing dialog boxes. 2.If a dialog box is dragged onto the docking symbol on the edge of the screen, it is arranged over the entire width of the screen.

3. If two screens are available, the elements can be undocked from the program interface and also placed on the second screen using Drag & Drop.

4. Furthermore, you can combine the project navigator, the table, and the result panel into a single dialog box by dragging a dialog box to the title bar of another dialog box.

Links

Contact us

Contact to Dlubal

Do you have questions or need advice?
Contact our free e-mail, chat, or forum support or find various suggested solutions and useful tips on our FAQ page.

+49 9673 9203 0

info@dlubal.com

RFEM Main Program
RFEM 5.xx

Main Program

Structural engineering software for finite element analysis (FEA) of planar and spatial structural systems consisting of plates, walls, shells, members (beams), solids and contact elements

Price of First License
3,540.00 USD
RSTAB Main Program
RSTAB 8.xx

Main Program

The structural engineering software for design of frame, beam and truss structures, performing linear and nonlinear calculations of internal forces, deformations, and support reactions

Price of First License
2,550.00 USD