The project concerns the replacement of an old steam-powered boiler in Kočevje with a new 9.8 MW biomass-powered boiler. The modernization includes biomass storage, woodchips transport systems, and an ash collector. The implementation was carried out while the existing boiler was in operation to ensure the temporary production of steam. This challenging project was designed and constructed by AG-inženiring d.o.o. in Slovenia. Find out more at ag-i.si
New Boiler House in Kočevje
| Number of Nodes | 1662 |
| Number of Lines | 2407 |
| Number of Members | 1336 |
| Number of Surfaces | 273 |
| Number of Load Cases | 1 |
| Total Weight | 2406.596 t |
| Dimensions (Metric) | 38.108 x 45.940 x 19.081 m |
| Dimensions (Imperial) | 125.03 x 150.72 x 62.6 feet |
| Program Version | 5.02.00 |