Technology brings people together, as is the case at the newly opened SMS Campus in Mönchengladbach, Germany. FormTL, a customer of Dlubal Software, designed an impressive roof structure connecting the individual buildings in the courtyard, which protects the inner courtyard from wind and weather.
As part of the 2024 Olympic Games, an extraordinary building project was designed for the river eco-district of l’Île-Saint-Denis (93).
The Gustave engineering office, a satisfied customer of Dlubal Software, carried out the entire structural design, from the initial ideas to the construction.
As part of the 2024 Olympic Games, an extraordinary building project was designed for the river eco-district of l’Île-Saint-Denis (93). The Gustave engineering office, a customer of Dlubal Software, was responsible for the entire structural design, from the initial ideas to the construction drawings.
For the 2024 Olympic Games, an extraordinary project of a five-story reversible building was designed for the river eco-district of l’Île-Saint-Denis (93). The GUSTAVE engineering office was responsible for the entire structural design, from the initial sketches to the detailed technical design.
The Better Energy project is a fascinating charging station that shows the future of green mobility infrastructure by combining best practices from the energy, ecology, and construction industries.
This project by Groupe Millet, a leading industrial carpentry company, forms part of an ambitious plan to significantly expand its warehouse near Bressuire, France. The structure of the new building with an area of 1,800 m² (19,375 ft²), called Extension M2, is primarily intended to enhance the company's operating capacities. GH Hervouet designed, manufactured, and assembled the steel frame, as well as the roofing and cladding components.
In a dynamic and constantly evolving market, the installation of a pastry production and storage facility in Montbert represents a strategic opportunity to meet growing consumer demand. The GH-Girard Hervouet company, a customer of Dlubal Software, was responsible for the steel construction, cladding, roofing, and metal work.
The transition to more sustainable energy sources is a global priority today. In this sense, the construction of a multi-energy station in Les Sables-d'Olonne, in the Vendée department (85), is an innovative and promising project. This station, consisting of three canopies with a height of 7.5 m (24.5 ft) and a total length of 40 m (131 ft), represents a significant investment to promote low-carbon mobility and local green energy. GH Hervouet, a customer of Dlubal Software, was responsible for the entire project, including carpentry, roofing and cladding.
As part of the urban development of Metz, a new gymnasium is under construction, featuring advanced engineering techniques and a commitment to sustainability. The project combines LC spruce GL24h cross-beams, steel columns, and insulated concrete precast walls to ensure the stability of the structure. The timber roof structure serves as a support for the photovoltaic panels. BET Moselle Bois, a customer of Dlubal Software, was responsible for the structural analysis and design.