3 Results
View Results:
Sort by:
SIDO Madera, a Spanish Dlubal customer, has designed a 21-meter-long (69 ft) bicycle-pedestrian bridge located in Orihuela, Alicante, Spain. It is made of GL24H pine timber, treated by autoclave with copper salts. In addition, hot-dip galvanized S235 steel fasteners were used.
In 2016, NEDCON received an assignment to install the steelwork for two fully-automated distribution centers for two supermarket companies. One distribution center is located in Michigan and the other distribution center is in Alberta, Canada.
The figure above shows the equivalent stress distribution under a concentrated load in the coordinate origin.