The Wolbecker road bridge No. 76 is part of the infrastructure project "Extension of the Dortmund-Ems Canal". In addition to the clearance width extension, the clearance height of the new bridge will be increased for the shipping traffic. As a result of broadening the canal section, the waterway can be used in the future by more efficient ships, running at a reasonable speed.

In cooperation with the design and architecture office Dissing + Weitling from Copenhagen, Dlubal customer grbv Ingenieure im Bauwesen GmbH & Co. & KG from Hanover carried out the preliminary and draft planning for the upcoming replacement building.

grbv Ingenieure im Bauwesen GmbH & Co. KG, Hanover, Germany
www.grbv.de.

Side view (top) and representation of 1. buckling figure of the Wolbecker road bridge in RSTAB (© grbv)

(0)
0 out of 5 stars
5 star 0
4 star 0
3 star 0
2 star 0
1 star 0

Steel Road Bridge

No Download Possible Customer Project / View Only
Number of Nodes 461
Number of Members 824
Number of Load Cases 69
Number of Load Combinations 2
Number of Result Combinations 35
Total Weight 420.424 tons
Dimensions (Metric) 76.288 x 14.100 x 16.750 m
Dimensions (Imperial) 250.29 x 46.26 x 54.95 feet
Program Version 8.10.01