In June 2023, a roof of the amphitheater of the Municipal Theater in Most was successfully completed. The membrane structure has been specially designed to provide protection from the sun and rain above the stage, while making the entire space a visual attraction. The author of the design is Carl Stahl & spol.; the calculation was carried out using the programs RFEM 5 and RWIND 2.
This project aims to rehabilitate, extend, and enhance the former Haras ice rink, located near the Château d'Angers, a castle in the city of Angers, belonging to the ABF sector (Architectes des Bâtiments de France). The aim is to create a modern sports facility that meets the needs of the local community while preserving the existing architectural heritage.
High Point "E" is a residential building with approximately 107,639 ft² of living space (13-story residential building on a 2-story base structure with a 2-story underground parking garage).
This project was designed using BIM technology. During the documentation process, IFC files were used for the data exchange. The architectural building model was first created in REVIT, then exported to RFEM to apply loads and complete the full structural analysis and design.
In the center of HafenCity Hamburg, a new building complex with an 18-story high-rise office building, a seven-story office building, a nine-story residential building, and a two-story underground parking garage was constructed.