[EN] FAQ 001474 | I have defined ten load cases and would like to add two load cases – after the third ...

Question:
I have defined ten load cases and would like to add two load cases – after the third load case. Is this possible?

Answer:
Yes, it is.

To do this, use the menu "Tools" → "Renumber" → "Move".

The numbering of load cases can be adjusted in the Load Cases and Load Combinations section. 

Here you can define the numbers of the load cases that should be moved to create a gap. The size of this gap is specified in the Move No. by column.