In the event of converting or extending a hall, the building owner may want to add a second or third crane to an existing crane runway. Since the original design usually does not consider other cranes, a common solution is to design a minimum distance between the cranes. This is done via the crane technology settings.
KB 000898 | Consideration of Minimum Distance Between Two Cranes
Links
Downloads
;