In May 2022, the new Sky Bridge footbridge opened in the Dolní Morava area (Czech Republic); it is the longest footbridge in the world, with a length of 2,365.49 ft. The design and construction of the footbridge were carried out by TAROS NOVA a.s., and the structural analysis was performed in RFEM 5.
In autumn 2012, construction started in Wörgl, Austria for an apartment complex that was, by request of the building owner, completely planned and designed as a BIM model, including structural analysis, work planning, call for tenders, and so on.
For this purpose, software tools from the company bimm GmbH were used, by which architects, structural engineers, and building engineers could work together efficiently on a 3D model. RFEM and the Autodesk programs Revit Architecture and Revit Structure, to which Dlubal has a direct interface, served as the basic software for this project.
The 5-story residential building with an impressive ecological balance was presented at the International Building Exhibition (IBA) in Hamburg, Germany. Being CO2-neutral in both its production and operation, the Woodcube's energy level corresponds approximately to that of a passive house. All material used in the timber cube is completely recyclable and biodegradable.
Isenmann Ingenieure from Haslach, a customer of Dlubal Software, was in charge of the structural planning. The calculation and design of the access core and the pile foundation made of reinforced concrete were performed in RFEM.
The Kozłowski-Projekt Engineering Office participated in designing a factory which produces wood‑based, high-endurance laminate panels. The project by MLT OOO was constructed in Torzhok, Russia, making it Europe’s largest manufacturer of panels of this type.
An extraordinary project was born when the architectural office of bergmeister-wolf designed a new workshop for wood carving art in Val Gardena, South Tyrol.
As the triangulated facade could be used only partially for load application, the building represented a great challenge for the responsible timber construction engineer. But the Italian Dlubal Software customer Schrentewein & Partner mastered the task by primarily using the building's inside parts for transferring loads.
Dlubal customer Estudi M103, an architecture office for structural consulting and calculation reports, was commissioned to carry out the structural consulting of the first office building built entirely of wood in Spain, using Dlubal RFEM software. It is an office building with a ground floor and 4 above-ground stories, located on Calle Llacuna 42 in Barcelona. With this type of building, construction periods are shortened due to the use of new sustainable materials, and even carbon emissions are reduced by 50% during construction.
An innovative research project has been carried out on the company premises of STM Montage GmbH in Lunzenau, Germany: A wind power plant with a lattice tower, where the uppermost segment consists of fiber-reinforced molded timber pipes.
Wildlife crossing AM2 was built with a construction method for concrete shell structures called Pneumatic Forming of Hardened Concrete (PFHC). This new method was developed by TU Wien in the context of the research project titled "Double Curved Shell Structures."
In October 2010, the Waterside Theatre opened its doors in Aylesbury, near London. In its floor plan and roof structure, the town's new emblem mirrors the shape of the Chiltern Hills in Southeast England.
The bar-shaped timber columns in the inside and outside areas refer to the depths of the forest. The facade's construction has an external supporting structure, which means that the building's envelope is actually built inside (reversed facade); it has a peanut-shaped floor plan with six different radii of curvature.
On the Mediterranean island of Formentera, a new cross-laminated timber building was constructed, which is used by a sailing school and a water sports center. The one-story building consists of two separate sections that are connected by low-lying glued-laminated beams in the roof area.