In order to expand its activity, the breakfast cereal manufacturer Dailycer France has requested the construction of an automated storage building located in Faverolles, in the north of France. This industrial and logistics facility consists mainly of a large reinforced concrete structure standing approximately 114 ft tall. This project was designed by the engineering office SPIC SAS, one of Dlubal Software's customers.
In the center of HafenCity Hamburg, a new building complex with an 18-story high-rise office building, a seven-story office building, a nine-story residential building, and a two-story underground parking garage was constructed.
High Point "E" is a residential building with approximately 107,639 ft² of living space (13-story residential building on a 2-story base structure with a 2-story underground parking garage).
The local council of Montmélian, located about ten kilometers (6.21 miles) from Chambéry in Savoy, has decided to expand its range of sporting facilities by investing in this new indoor tennis court project. This shining perspective of light and the sun, originally inspired by the city's designation of "Solar Montmélian", symbolizes the heart of this project, highlighted by the maximum exploitation of natural light, which is composed of translucent polycarbonate sheets and photovoltaic panels covering 5,812.51 ft² of the facility.
EGOIN SA was awarded a timber design project for 35 new CLT apartments in Girona, Spain. Cross-laminated timber (CLT) was selected as the building material due to its sustainability, ability to filter CO2, and architectural design freedom.
In June 2023, the roof of the amphitheater near the Benedikt water reservoir in Most was successfully completed. The membrane structure was specially designed to provide protection from the sun and rain above the stage, while making the entire space a visual attraction. The author of the design is Carl Stahl & spol.; the calculation was carried out using the programs RFEM 5 and RWIND 2.
This project was designed using BIM technology. During the documentation process, IFC files were used for the data exchange. The architectural building model was first created in REVIT, then exported to RFEM to apply loads and complete the full structural analysis and design.