EGOIN SA was awarded a timber design project for 35 new CLT apartments in Girona, Spain. Cross-laminated timber (CLT) was selected as the building material due to its sustainability, ability to filter CO2, and architectural design freedom.
In 2017 Scaldaferro, a Torrone manufacturer in Dolo (Venice) and owner of the historic building "Locanda alla Posta", contracted Ri-Legno S.r.l., a leading company in timber reconstruction, to deal with the building's 55.7 ft x 52.4 ft timber roof.
Dlubal customer Maderas Besteiro is a third-generation family-owned company focusing on timber-based construction and manufacturing. The company's driving value of providing socially and environmentally sustainable houses to the local community has shown itself once again.
This project was designed using BIM technology. During the documentation process, IFC files were used for the data exchange. The architectural building model was first created in REVIT, then exported to RFEM to apply loads and complete the full structural analysis and design.
In 2019, an extraordinary pavilion was constructed in Diemersteiner Tal near Kaiserslautern, Germany. The structure is constructed entirely from timber and did not require any metal fasteners.
High Point "E" is a residential building with approximately 107,639 ft² of living space (13-story residential building on a 2-story base structure with a 2-story underground parking garage).
The efficient combination of wood, steel, and glass composing this staircase, fashioned by the YLEx design office, provides a soothing perspective of lightness.
The local council of Montmélian, located about ten kilometers (6.21 miles) from Chambéry in Savoy, has decided to expand its range of sporting facilities by investing in this new indoor tennis court project. This shining perspective of light and the sun, originally inspired by the city's designation of "Solar Montmélian", symbolizes the heart of this project, highlighted by the maximum exploitation of natural light, which is composed of translucent polycarbonate sheets and photovoltaic panels covering 5,812.51 ft² of the facility.
In order to meet the increasing demand arising from growing staff numbers, the company OköFEN, which specializes in wood pellet boilers, conducted the construction of new premises for its French head office. This project is rooted in an environmental approach featuring a structure entirely made of French wood, biobased insulation in cellulose wadding, and a significant supply of natural light thanks to its multiple openings.
This project represents a major technical challenge for the company Le Bras Frères, of which the new team embodies an internal generational shift highlighted by a significant desire to increase skills and productivity through new investments (acquisition of a size K2i machine, extension of production facilities, and so on).