The extension in the Bohnau business park is not only sustainable, but also particularly innovative. For the first time in Germany, a connection system for cross-laminated timber floors without any downstand beams, though providing large spans, has been implemented.
This project is about the construction of an elevator shaft to replace the existing staircase and provide access to the underpass. The shaft was made of surface components consisting of reinforced concrete, ensuring its stability and durability with control of cracking at the same time.
This project aims to rehabilitate, extend, and enhance the former Haras ice rink, located near the Château d'Angers, a castle in the city of Angers, belonging to the ABF sector (Architectes des Bâtiments de France). The aim is to create a modern sports facility that meets the needs of the local community while preserving the existing architectural heritage.
The tree tower has provided a 360-degree view of the "Avondale Forest Park" in Ireland since July 2022. At the same time, the country's first treetop path was created; it was opened by Micheal D. Higgins, President of Ireland.
A modern 6-seater chairlift called sixpack Mooslehen opened in Filzmoos, Austria on December 17, 2021, right on time for the start of the ski season. The construction time for the entire project was only six months. The company m3-ZT, an Austrian customer of Dlubal, was responsible for the structural analysis, using the FEA program RFEM.
As of July 2020, the Frankfurt City Forest once again has a lookout tower. The old Goethe Tower completely burned down due to arson in October 2017. The new Goethe Tower was designed similar to the original design from 1931. This time, however, it was built without chemical wood preservatives.
In addition to the cruise terminal located at Berth 7, a second cruise ship check-in terminal was constructed in Warnemünde. There are occasions when three ships may call at the same time.
In late 2018, Naikoon Contracting Ltd. announced the location of their new global headquarters in Vancouver, BC, with a grand opening in spring 2019. The new office is centered around a stunning cross-laminated timber (CLT) staircase which utilizes a profound gluing technology developed by Timber Structures 3.0 (TS3). This marks the first time TS3 has been used in North America.
Within a short period of time, a modern aluminum structure with sophisticated building services was constructed for the company Hydro Aluminium in Grevenbroich.
The construction project on the premises near Düsseldorf covers approximately a length of 722 ft and a width of 394 ft. It includes various connecting bridges to the existing premises, a three-aisle production hall with outbuildings, and a 328-foot-long and 99-foot-high high-rack warehouse, which was constructed in slipform paving technology.
The theater, built in 1911-1913, has a varied history. The building was destroyed by Allied air attacks in February 1945, reconstructed in the postwar years, and damaged by floods in August 2002. Within an 18‑week break, the Dresden theater was extensively renovated and modernized.
The chapel adjoining the old convent of San Pedro in Lugo, Spain is an original construction dating back to 1690. Its ancient roof structure was based on trusses simply supported in putlog holes located in the main wall of the church. Damage appeared here. Over time, the lower vault of the structure deteriorated to the point of limiting access to the interior.
The renovation consisted of completely replacing the roof in order to make the space below fully usable again and to provide natural light to the main temple room through the stunning church windows. Previously, the windows were boarded up in order to support the roof trusses.
The continuous casting plant of the JSW ISPAT steelworks in India was extended by an additional level and completed by new plant components and stair towers. At the same time, the existing structure was reinforced to be able to absorb the additional weight of the new components as well as increased seismic loads.
In Jeddah, Saudi Arabia, a 2,645.5-ton mosque was moved in its entirety over a distance of 120 m (394 ft). This was the first time in Saudi Arabia that an entire building was to be moved to a different location.
In the Italian town of Brescia, the company Rubner Objektbau GmbH, functioning as the general contractor, has built an apartment complex with appealing architecture consisting of timber. Four housing complexes with a total of 72 housing units were constructed in a minimal amount of time. For the Lombard Institute for Residential Buildings (ALER), this was the first project carried out in wood.
The G3 Shopping Resort in Gerasdorf, in the north of Vienna, opened in 2012. At the time, it was the largest cross-laminated timber project ever, and Europe's largest timber construction site.
The grate scaffolding of the biomass power plant in Berlin-Neukölln, Germany, is a structure with a high temperature load.
The engineering office of Jürgen Ehlenz from Beckingen, a long-time Dlubal customer, was responsible for the structural analysis of the grate scaffolding with moving parts, as well as for the construction and design of the piping.