A slender, elegant bridge for pedestrians and cyclists connects the old town and the hospital town of the large district town of Eichstätt, Germany. This customer project was awarded with the "Bavarian Engineering Award 2023" and the "Ernst & Sohn Engineering Construction Award 2024" – and rightly so, because it really is something special.
The four-story office building welcomes visitors, members, and employees of the AmperVerband company in its modern premises. The entrance area of the partially glazed facade includes inclined, V‑shaped composite steel columns spanning two floors.
The extension in the Bohnau business park is not only sustainable, but also particularly innovative. For the first time in Germany, a connection system for cross-laminated timber floors without any downstand beams, though providing large spans, has been implemented.
In Münster, a pedestrian and cycle bridge must be replaced. What is special here is the elegant structure spanning the Dortmund-Ems Canal in a smooth arc. A very interesting structure!
The King Louis Bridge is listed as a heritage building; built in 1852, with a length of about 403 ft, it is an outstanding example of civil engineering in Germany. Since 1986, the former railroad bridge, made of timber and steel, has been used as a pedestrian and cyclist bridge across the more than 98-ft-deep river incision in the Iller River.
The German "Digital Timber Construction" (DTC) Lab headed by Prof. Dr. Christopher Robeller has recently completed an impressive showcase of its research activities. It is a lightweight and environmentally friendly timber gridshell, which is part of the "Timber Structure Interface" (TSI) research project, built in Moritzplatz in the city of Augsburg, Germany.
With the design of the BSH20 A "Stories" building, Dlubal customer PIRMIN JUNG has taken the classic apartment building to a new level. Due to the innovative use of cross-laminated timber, this customer project has a very special appeal, which fits remarkably yet harmonically into the cityscape of Amsterdam. A really interesting and beautiful building structure.
The successful general redevelopment of AQUAtherm has been providing year-round swimming pleasure in Straubing since 2021. The structure of the indoor swimming pool is something very special.
The existing Freischütz pedestrian and cyclist bridge was renewed as part of the 4-lane widening of federal highway 236 between Dortmund/Schwerte and the Schwerte motorway junction of the Autobahn 1 highway.
In Cologne, a new exhibition greenhouse and an orangery are going to enrich the Flora botanical garden. The exhibition greenhouse consists of three arched building sections that are connected to each other.
The Jewish community center, including a synagogue, is an all-round successful structure, fitting seamlessly into the cityscape of Regensburg, Germany. The connection of a community center in the northern part and a synagogue with a spherical dome in the southern part is something very special.
In 2022, the event area of the breathtaking "Harzdrenalin" attraction was given an elegant canvas roof made of three membranes. This lightweight structure is intended to protect visitors from sun and rain.
The triple sports hall with a saw-tooth roof built in the German town of Stuttgart-Waldau impressively shows the sustainable perspectives of modern timber structures. The trusses arranged in the shape of boxes ensure optimal daylight.
The new sports hall of the Alice Salomon School in Hanover is exceptional from an architectural and structural point of view. The timber structure stands on a reinforced concrete first floor and cantilevers above it at the sides about 18 ft.
This esthetically sophisticated commercial construction built in the German town of Dunningen consists of two halls used for production and storage, extending over an area of about 43,056 ft², and includes a two-story solid structure covering 8,611 ft².
An extraordinary bell tower has been built in Bleibach in the Southern Black Forest Nature Park, Germany. The structure, with a height of approximately 111.5 ft, has a triangular floor plan and consists mainly of cross-laminated timber (CLT).
As of July 2020, the Frankfurt City Forest once again has a lookout tower. The old Goethe Tower completely burned down due to arson in October 2017. The new Goethe Tower was designed similar to the original design from 1931. This time, however, it was built without chemical wood preservatives.
This 7-story building, with 57,048.73 ft² of floor space, is used as a vocational school. The dimensions (length x width x height) are approximately 150.92 ft x 65.62 ft x 71.52 ft.
An innovative research project has been carried out on the company premises of STM Montage GmbH in Lunzenau, Germany: A wind power plant with a lattice tower, where the uppermost segment consists of fiber-reinforced molded timber pipes.
On the site of the former US hospital in Heidelberg-Rohrbach, a dormitory is being constructed that will be both a residence and a meeting place for students, trainees, and young professionals from the Collegium Academicum.
The Ems Canal Bridge (KBr), built in the 1930s, will be renovated at DEK-km 78.806N as part of the German Dortmund-Ems Canal (DEK) expansion effort. A double half-through bridge is planned for the new structure, where construction will begin while the shipment is in progress.
High Point "E" is a residential building with approximately 107,639 ft² of living space (13-story residential building on a 2-story base structure with a 2-story underground parking garage).
In 2019, an extraordinary pavilion was constructed in Diemersteiner Tal near Kaiserslautern, Germany. The structure is constructed entirely from timber and did not require any metal fasteners.
This multi-material tower structure includes mainly timber and steel elements. Only the foundation and attached rigid columns were constructed as reinforced concrete.
In Passau's Haidenhof district, a new sports hall extends to the existing school building. A 196.8-foot-long indoor athletics competition facility with four tracks - the "sprint tunnel" - connects the hall and the existing building.
The new VoltAir office building in Berlin includes a 394 ft x 213 ft area and a height close to 98 ft. The building envelope consists of multiple box elements which form the interior and exterior corners.
In addition to the cruise terminal located at Berth 7, a second cruise ship check-in terminal was constructed in Warnemünde. There are occasions when three ships may call at the same time.
In the center of HafenCity Hamburg, a new building complex with an 18-story high-rise office building, a seven-story office building, a nine-story residential building, and a two-story underground parking garage was constructed.
Every summer, movie nights and other events take place on the banks of the Elbe in Dresden. The more than 55 film events and numerous concerts with national and international artists are attended by more than 200,000 guests.