The Technical University of Munich is currently undertaking the construction of a new laboratory building on its campus with the intention of further advancing state-of-the-art research. Not only is the building's purpose forward-thinking, but so is its sustainable construction.
The Better Energy project is a fascinating charging station that shows the future of green mobility infrastructure by combining best practices from the energy, ecology, and construction industries.
In a dynamic and constantly evolving market, the installation of a pastry production and storage facility in Montbert represents a strategic opportunity to meet growing consumer demand. The GH-Girard Hervouet company, a customer of Dlubal Software, was responsible for the steel construction, cladding, roofing, and metal work.
A slender, elegant bridge for pedestrians and cyclists connects the old town and the hospital town of the large district town of Eichstätt, Germany. This customer project was awarded with the "Bavarian Engineering Award 2023" and the "Ernst & Sohn Engineering Construction Award 2024" – and rightly so, because it really is something special.
The transition to more sustainable energy sources is a global priority today. In this sense, the construction of a multi-energy station in Les Sables-d'Olonne, in the Vendée department (85), is an innovative and promising project. This station, consisting of three canopies with a height of 7.5 m (24.5 ft) and a total length of 40 m (131 ft), represents a significant investment to promote low-carbon mobility and local green energy. GH Hervouet, a customer of Dlubal Software, was responsible for the entire project, including carpentry, roofing and cladding.
As part of the urban development of Metz, a new gymnasium is under construction, featuring advanced engineering techniques and a commitment to sustainability. The project combines LC spruce GL24h cross-beams, steel columns, and insulated concrete precast walls to ensure the stability of the structure. The timber roof structure serves as a support for the photovoltaic panels. BET Moselle Bois, a customer of Dlubal Software, was responsible for the structural analysis and design.
This project is about the construction of an elevator shaft to replace the existing staircase and provide access to the underpass. The shaft was made of surface components consisting of reinforced concrete, ensuring its stability and durability with control of cracking at the same time.
The German "Digital Timber Construction" (DTC) Lab headed by Prof. Dr. Christopher Robeller has recently completed an impressive showcase of its research activities. It is a lightweight and environmentally friendly timber gridshell, which is part of the "Timber Structure Interface" (TSI) research project, built in Moritzplatz in the city of Augsburg, Germany.
As part of the renovation and reconstruction of the sports area at a multi-purpose city high school in the north of Mayotte, an overseas department of France, a roofing was built as a steel-textile structure to protect the area from bad weather and the sun.
This project aims to rehabilitate, extend, and enhance the former Haras ice rink, located near the Château d'Angers, a castle in the city of Angers, belonging to the ABF sector (Architectes des Bâtiments de France). The aim is to create a modern sports facility that meets the needs of the local community while preserving the existing architectural heritage.
Edelweiss Industrial Park Münchwilen combines modern office space and storage facilities with a production hall. The timber structure, with a timber-concrete composite ceiling, forms an interesting structure that is an excellent example of modern and efficient construction.
A developer project of 121 apartments in 2 identical buildings for rent with an area of 53,820 ft² each, designed by CIP ARQUITECTOS SL, was built by the construction company ACR in just 13 months of construction, including earthworks, foundations, and basement, using the industrialized Steel Framing system by AFCA Teccon, a customer of Dlubal Software.
Lokstadt, a new urban district, is under construction in the city of Winterthur, Switzerland. The first building to be completed is called "Crocodile". This residential building, which was BIM planned right from the start, is one of the largest timber structures in Switzerland.
In order to increase the number of places in the René-Cassin college canteen in Éloyes, the Departmental Council launched major expansion works in 2020. This extension required the reconstruction of a new timber courtyard covering an area of 4,521 ft².
The new Desmet-Dardenne funeral parlor opened in the town of Chimay, France in 2021. In the search for an ecological construction, the choice focused on a structure made mainly of timber. Due to the free area of approximately 15,177 ft², the structure of this new funeral parlor allowed for gathering various funeral services in one place: a reception hall, workshop, store, offices, and storage space.
In May 2022, the new Sky Bridge footbridge opened in the Dolní Morava area (Czech Republic); it is the longest footbridge in the world, with a length of 2,365.49 ft. The design and construction of the footbridge were carried out by TAROS NOVA a.s., and the structural analysis was performed in RFEM 5.
This esthetically sophisticated commercial construction built in the German town of Dunningen consists of two halls used for production and storage, extending over an area of about 43,056 ft², and includes a two-story solid structure covering 8,611 ft².
The SDEA Engineering Solutions Advanced Engineering department has extensive experience in mechanical-structural analysis using the finite element method for various structure types and equipment for different industrial sectors such as steel, metalworking, oil and gas, energy, railroads, and metallurgy, among others, as well as for the construction sector.
A modern 6-seater chairlift called sixpack Mooslehen opened in Filzmoos, Austria on December 17, 2021, right on time for the start of the ski season. The construction time for the entire project was only six months. The company m3-ZT, an Austrian customer of Dlubal, was responsible for the structural analysis, using the FEA program RFEM.
The Lesotho Highlands Water Project is a multi-phase binational project carried out by the Kingdom of Lesotho together with the Republic of South Africa.
In order to expand its activity, the breakfast cereal manufacturer Dailycer France has requested the construction of an automated storage building located in Faverolles, in the north of France. This industrial and logistics facility consists mainly of a large reinforced concrete structure standing approximately 114 ft tall. This project was designed by the engineering office SPIC SAS, one of Dlubal Software's customers.
This project represents a major technical challenge for the company Le Bras Frères, of which the new team embodies an internal generational shift highlighted by a significant desire to increase skills and productivity through new investments (acquisition of a size K2i machine, extension of production facilities, and so on).
In order to meet the increasing demand arising from growing staff numbers, the company OköFEN, which specializes in wood pellet boilers, conducted the construction of new premises for its French head office. This project is rooted in an environmental approach featuring a structure entirely made of French wood, biobased insulation in cellulose wadding, and a significant supply of natural light thanks to its multiple openings.
Dlubal's Spanish customer Estudi M103, an architectural office for structural consulting and calculation reports located in Barcelona, participated in an extraordinary construction project. The "Cirerers" project arises from a contest for municipal building sites for cohousing published by the Barcelona City Council in 2016.
Dlubal customer Estudi M103, an architecture office for structural consulting and calculation reports, was commissioned to carry out the structural consulting of the first office building built entirely of wood in Spain, using Dlubal RFEM software. It is an office building with a ground floor and 4 above-ground stories, located on Calle Llacuna 42 in Barcelona. With this type of building, construction periods are shortened due to the use of new sustainable materials, and even carbon emissions are reduced by 50% during construction.
The construction of a 328-foot-high tower at an altitude of about 6,890 ft above sea level is a particularly challenging task. A project of this type was realized in September 2020 in the area of the "Windsfeld" summit in Flachau / Flachauwinkl, Austria. The met mast is one of the tallest structures in Austria.
The local council of Montmélian, located about ten kilometers (6.21 miles) from Chambéry in Savoy, has decided to expand its range of sporting facilities by investing in this new indoor tennis court project. This shining perspective of light and the sun, originally inspired by the city's designation of "Solar Montmélian", symbolizes the heart of this project, highlighted by the maximum exploitation of natural light, which is composed of translucent polycarbonate sheets and photovoltaic panels covering 5,812.51 ft² of the facility.
The Ems Canal Bridge (KBr), built in the 1930s, will be renovated at DEK-km 78.806N as part of the German Dortmund-Ems Canal (DEK) expansion effort. A double half-through bridge is planned for the new structure, where construction will begin while the shipment is in progress.
China’s increasing economic development has led to the construction of many large commercial complexes with an increasing demand for escalators with great heights and large spans, without intermediate supports.