A slender, elegant bridge for pedestrians and cyclists connects the old town and the hospital town of the large district town of Eichstätt, Germany. This customer project was awarded with the "Bavarian Engineering Award 2023" and the "Ernst & Sohn Engineering Construction Award 2024" – and rightly so, because it really is something special.
The German "Digital Timber Construction" (DTC) Lab headed by Prof. Dr. Christopher Robeller has recently completed an impressive showcase of its research activities. It is a lightweight and environmentally friendly timber gridshell, which is part of the "Timber Structure Interface" (TSI) research project, built in Moritzplatz in the city of Augsburg, Germany.
A developer project of 121 apartments in 2 identical buildings for rent with an area of 53,820 ft² each, designed by CIP ARQUITECTOS SL, was built by the construction company ACR in just 13 months of construction, including earthworks, foundations, and basement, using the industrialized Steel Framing system by AFCA Teccon, a customer of Dlubal Software.
Lokstadt, a new urban district, is under construction in the city of Winterthur, Switzerland. The first building to be completed is called "Crocodile". This residential building, which was BIM planned right from the start, is one of the largest timber structures in Switzerland.
In May 2022, the new Sky Bridge footbridge opened in the Dolní Morava area (Czech Republic); it is the longest footbridge in the world, with a length of 2,365.49 ft. The design and construction of the footbridge were carried out by TAROS NOVA a.s., and the structural analysis was performed in RFEM 5.
A modern 6-seater chairlift called sixpack Mooslehen opened in Filzmoos, Austria on December 17, 2021, right on time for the start of the ski season. The construction time for the entire project was only six months. The company m3-ZT, an Austrian customer of Dlubal, was responsible for the structural analysis, using the FEA program RFEM.
The construction of a 328-foot-high tower at an altitude of about 6,890 ft above sea level is a particularly challenging task. A project of this type was realized in September 2020 in the area of the "Windsfeld" summit in Flachau / Flachauwinkl, Austria. The met mast is one of the tallest structures in Austria.
The Ems Canal Bridge (KBr), built in the 1930s, will be renovated at DEK-km 78.806N as part of the German Dortmund-Ems Canal (DEK) expansion effort. A double half-through bridge is planned for the new structure, where construction will begin while the shipment is in progress.
Dlubal customer Maderas Besteiro is a third-generation family-owned company focusing on timber-based construction and manufacturing. The company's driving value of providing socially and environmentally sustainable houses to the local community has shown itself once again.